
Model  | AIN-LFP 5000  | AIN-LFP 2400  | AIN-LFP 2500  | AIN-LFP 2600HV  | 
Total energy(DC)  | 5.1kWh  | 2.4kWh  | 2.5kWh  | 2.56kWh  | 
Usable energy(DC)  | 4.6kWh  | 2.2kWh  | 2.2kWh  | 2.2kWh  | 
Norminal dis-/charge power  | 3.0kw  | 2.75kw  | 3.75kw  | 4.6kw  | 
Peak power(only discharge)  | 6kw for 3s  | 3kw for 3s  | 3kw for 3s  | 3kw for 3s  | 
Constant current(only discharge)  | 80A  | 40A  | 40A  | 20A  | 
Voltage  | 48-56Vdc  | 48-56Vdc  | 48-56Vdc  | 96-112Vdc  | 
Norminal voltage  | 51.2Vdc  | 51.2Vdc  | 51.2Vdc  | 102.4Vdc  | 
Norminal current  | 60A  | 30A  | 30A  | 15A  | 
Max.charge voltage  | 57.6Vdc  | 57.6Vdc  | 57.6Vdc  | 115.2Vdc  | 
Weight  | 45kg  | 27.5kg  | 23kg  | 24kg  | 
Dimension(mm)  | 500*442*135mm  | 500*442*133mm  | 500*442*88mm  | 500*442*88mm  | 
Max.recommended DOD  | 90%  | |||
Operating condition  | Indoor  | |||
Operating temperature  | 0--45 deg (charge); -10-- 50 deg (discharge)  | |||
WIFI frequency range  | 2400MHz--2483MHz  | |||
Humidity  | <60%(No condensed water)  | |||
Pollution degree  | 3  | |||
Over voltage category  | II  | |||
Cooling type  | Natural cooling  | |||
Case material  | Metal  | |||
Color  | Black or White  | |||
Installation  | Wall mounting/Ground Installation  | |||
IP rating  | IP20  | |||
Protective class  | I  | |||
Max.numbers of parallel or series  | 8S/4P  | 8S/8P  | 8S/8P  | 6S  | 
Warranty  | 10years  | |||
Life span  | >15years  | |||
Communication  | CAN/RS485  | |||
Protection mode  | Dual hardware protection  | |||
Battery protection  | Over-current/Over-voltage/Short circuit/Under voltage/Over temperature  | |||
Safety  | CE TUV  | |||
Hazardous material classification  | 9  | |||
Transportation  | UN38.3  | |||
 
 
The Energy Storage battery has following advantages
1.Assemblly freely in series or parallel: up to 8S8P(448V326.4kWh)
![]()  | Optimized self-consumption will be achieved. Batteries are used to store the excess energy produced by PV systerm | 
![]()  | Extra energy will be fed into the grid when batteries are fully charged and system has already met its self consumption requirement. | 
![]()  | Batteries will power the AC load when the sun sets. | 
![]()  | If the battery capacity is insufficient to meet self consumption, electricity will be obtained from the grid. | 





 

Payment Terms  | T/T  | EXW  | 30%  in advance for deposit payment, the balance payments will be paid before shipment.  | |
FOB  | ||||
CFR/C&F  | 30%  in advance for deposit payment, the balance will be paid against copy of B/L  | |||
CIF  | ||||
L/C  | For the amount  of one shipment above 50,000 usd,  L/C at sight  is acceptable.  | |||
West Union  | For the amount less than 5000 usd  | |||
Paypal  | ||||
Delivery Time  | 7~25 days after receiving the payment or the deposit payment  | |||
100% Products quality protection
 
 














